E Road, Phase 2b, 31 Rd & E Rd Bridge

Replacement of bridge and widening of E Rd at 31 Rd. intersection to match improvements on Ph. 2a.

29 Road & I-70 Interchange

Go to the 29 Road Interchange project webpage for current information on the project.

Photograph of Highway bridge over Colorado River with Bookcliffs in  background

38 Road Bike & Pedestrian Improvements (Hwy 6 south to OMID.)

Widen 38 Rd and add shared use path on west side and install new guardrail. Requires wall along canal and pedestrian bridges.

Mesa Q-6.8 Bridge Rehabilitation

Rehabilitate bridge of West Salt Creek.

Coffman Road Rehabilitation, Landfill to SH-141

Rehab roadway from Landfill entrance to Hwy 141. 3 1/4 miles. South .6 miles to be improved to urban standards.  Multi-year project.

16 Road Guardrail Replacement

Replace guardrail at N Rd hill.

18 Road FLAP

Pave 18 Road from Highline Canal to CPW camp grounds.

22 1/2 Rd & Greenbelt

Pipe and repair drainage swale on Greenbelt and constuct concrete path on 22 1/2 Rd.

32 1/2 Road, Ph. 1a -south of E Rd to GVIC canal

Construct missing 32 1/2 Rd section through private property at 3249 E Rd. and north of E Rd including canal crossing bridge.

32 1/2 Road, Ph. 2 -north of canal to UPRR Xing

Improvements needed to bring to urban collector standards and provide multi-modal use.

C 1/2 Road Improvements (Las Colonias to 29 Rd)

Overlay w/ leveling course and minor drainage to be done by City with partnership from County and gravel pit.

Douglas Wash Detention Basin

Final design of detention basin.

E Road Improvements, Ph. 3 (Green Acres St. to 33 Road)

Urban section per the E Road corridor study,  completes E Road improvements and provides for safe multimodal traffic.

E 1/2 Rd. (Orchard Ave.) Ph. 1 Road Improvements

Construction of urban collector section from Warrior Way to Eastbrook St. to provide pedestrian and bicycle improvements and increase traffic safety. Includes replacement of Lewis Wash bridge.

Independence Valley Subdivision

Wide-crack repair with seal coat of subdivision roads.

Kimball Creek & Buzzard Creek Intersection Repair

Fix settlement/possible slide in intersection.

Little Park Road Rehab

Rehab 1.7 mile section of road from bentonite pit ot Bangs Canyon TH.

Melody Estates Drainage

Install dry well drainage system in subdivision to address roadway flooding.

N. River Road - Rehab. Ph. 2 section

Drainage improvements.

MM-O-16.1 Bridge Replacement

Replace functionally obsolete 10'x10' Box culvert, 22 1/2 ' lg., over East Branch Reed Wash.

Riverfront Train Connector, 33 1/2 Rd to Palisade

Conceptual study of alternate routes for missing section of trail.

Riverfront Trail - Las Colonias to 29 Rd

CPW project in partnership with City and County.  Complete missing section of Riverfront Trail.

S. Broadway/SH 340 Turnlane

Add right turnlane on SH 340 at S. Broadway

 

 