Capital Improvement Projects
Current Project Status
These projects are scheduled for various time frames over the next few years. Details will be posted as they become available.
Page Updated 01/22/2024
E Road, Phase 2b, 31 Rd & E Rd Bridge
Replacement of bridge and widening of E Rd at 31 Rd. intersection to match improvements on Ph. 2a.
29 Road & I-70 Interchange
Go to the 29 Road Interchange project webpage for current information on the project.
38 Road Bike & Pedestrian Improvements (Hwy 6 south to OMID.)
Widen 38 Rd and add shared use path on west side and install new guardrail. Requires wall along canal and pedestrian bridges.
Mesa Q-6.8 Bridge Rehabilitation
Rehabilitate bridge of West Salt Creek.
Coffman Road Rehabilitation, Landfill to SH-141
Rehab roadway from Landfill entrance to Hwy 141. 3 1/4 miles. South .6 miles to be improved to urban standards. Multi-year project.
16 Road Guardrail Replacement
Replace guardrail at N Rd hill.
18 Road FLAP
Pave 18 Road from Highline Canal to CPW camp grounds.
22 1/2 Rd & Greenbelt
Pipe and repair drainage swale on Greenbelt and constuct concrete path on 22 1/2 Rd.
32 1/2 Road, Ph. 1a -south of E Rd to GVIC canal
Construct missing 32 1/2 Rd section through private property at 3249 E Rd. and north of E Rd including canal crossing bridge.
32 1/2 Road, Ph. 2 -north of canal to UPRR Xing
Improvements needed to bring to urban collector standards and provide multi-modal use.
C 1/2 Road Improvements (Las Colonias to 29 Rd)
Overlay w/ leveling course and minor drainage to be done by City with partnership from County and gravel pit.
Douglas Wash Detention Basin
Final design of detention basin.
E Road Improvements, Ph. 3 (Green Acres St. to 33 Road)
Urban section per the E Road corridor study, completes E Road improvements and provides for safe multimodal traffic.
E 1/2 Rd. (Orchard Ave.) Ph. 1 Road Improvements
Construction of urban collector section from Warrior Way to Eastbrook St. to provide pedestrian and bicycle improvements and increase traffic safety. Includes replacement of Lewis Wash bridge.
Independence Valley Subdivision
Wide-crack repair with seal coat of subdivision roads.
Kimball Creek & Buzzard Creek Intersection Repair
Fix settlement/possible slide in intersection.
Little Park Road Rehab
Rehab 1.7 mile section of road from bentonite pit ot Bangs Canyon TH.
Melody Estates Drainage
Install dry well drainage system in subdivision to address roadway flooding.
N. River Road - Rehab. Ph. 2 section
Drainage improvements.
MM-O-16.1 Bridge Replacement
Replace functionally obsolete 10'x10' Box culvert, 22 1/2 ' lg., over East Branch Reed Wash.
Riverfront Train Connector, 33 1/2 Rd to Palisade
Conceptual study of alternate routes for missing section of trail.
Riverfront Trail - Las Colonias to 29 Rd
CPW project in partnership with City and County. Complete missing section of Riverfront Trail.
S. Broadway/SH 340 Turnlane
Add right turnlane on SH 340 at S. Broadway